Peter John SHEARD 1923 – 2002

 

HMS Emerald War Record January 1943 to 30/09/1944

1 9 4 3

January to March
12-MarPeter Joined Ship
April
Post refit trials.
7thRecommissioned for service in 4th Cruiser Squadron, Eastern Fleet. Took passage to Scapa Flow.
May
Carried out work-up for operational service at Scapa Flow up at Scapa Flow.
June
Deployed in NW Approaches
July
Joined military convoy KMF19 in Clyde as part of escort during passage to Gibraltar with troops and equipment for planned landings in Sicily.
Detached from KMF19 on arrival at Gibraltar and took passage to Cape of Good Hope.
August
Passage in Indian Ocean.
20thArrived at Kilindini for redesignated service with 5th Cruiser Squadron, Eastern Fleet for trade defence and convoy escort in Indian Ocean.
September
3rdJoined military convoy WS32 as Ocean Escort on passage from Durban to Bombay.
10thDetached from WS32 on arrival at Bombay. Took passage to Aden
28thAt Aden.
October to December
Deployed for convoy defence between Aden and Durban.

1 9 4 4

January to February
Transferred to Colombo for Fleet duties with 4th Cruiser Squadron and took passage from Kilindini. Deployed in Indian Ocean and Arabian Sea.
(Note: By February HM Battlecruiser RENOWN, HM Battleships QUEEN ELIZABETH and VALIANT had joined Fleet at Trincomalee and were preparing for operations against enemy positions in Sumatra and Andaman Islands. See WAR WITH JAPAN and THE FORGOTTEN FLEET by J Winton.)
March
Nominated for return to UK.
3rdTook passage from Trincomalee.
22ndRescued 32 survivors from British freighter NANCY MOLLER sunk by a Japanese submarine on 18th. (Note: Survivors were landed in Durban)
April
Passage in Atlantic.
 Joined Home Fleet on arrival and took passage to Rosyth for refit.
Nominated for service in support of planned allied landings in Normandy with Bombarding Force K and to join Eastern Task Force on release from Force K (Operation NEPTUNE)
Target in Pre-Arranged Fire Plan –Arromanches for assault by Force G on GOLD beaches. For details see LANDINGS IN NORMANDY, June 1944 (HMSO).)
May
2ndTaken in hand for refit by HM Dockyard. (Note: Aircraft facilities removed and additional 20mm Oerlikon guns fitted.)
On completion joined 10th Cruiser Squadron at Scapa Flow. Took part in bombardment exercises off Cape Wrath.
31stArrived in Clyde to join ships of Force K,
June
3rdTook passage to Portsmouth with HM Cruisers ORION, AJAX, ARGONAUT and Dutch Gunboat FLORES, HM Destroyers GRENVILLE and UNDINE.
4thOperation delayed 24 hours.
5thIn Solent awaiting departure through swept channel.
6thArrived in Bombardment position. Carried out bombardment of batteries off Gold Beach. D-Day Map
7thUnder air attack and sustained slight damage from near miss. Provided naval gunfire support for landing of Royal Marine Commando attack on Port en Besin. Towed to position because of threat from acoustic mines after DRAGON blew up alongside.
16thReturned to Portsmouth to replenish for further support duties in Eastern Task Force.
July
Eastern Task Force deployment in continuation.
7thProvided naval gunfire support during military operations in Caen area.
On release from Eastern Task Force took passage to Rosyth for repair
August
Under repair at Rosyth.
On completion future service under consideration.
(Note: Transfer to RCN for training duties was not implemented.)
September to October
Withdrawn from operational use and Paid-off. Reduced to Reserve status at Rosyth. Reducing to Reserve.
30-SepPeter Left Ship

 

Next we move onto Peter’s Merchant Navy Career